2010 florida building code plumbing 904 1 roof extension.
Roof vent height code.
So only use.
Quoting the irc model plumbing code.
Also see chimney height clearance code separate article that compares the b vent with other chimney types.
Access draft stops and ventilation.
In locations known for snow the vent pipe needs to be at least 51 mm 2 in in diameter and 305 mm inside an insulated area of a building before extending through the roof.
Ubc 97 section 1505 attics.
In addition the drainage piping of each building and each connection to a public sewer or a.
Open vent pipes that extend through a roof shall be terminated at least 18 inches 456 mm above the roof or 6 inches 152 mm above the anticipated snow accumulation whichever is greater except that where a roof is to be used for any purpose other than weather protection the vent extension shall be run at least 7 feet 2134 mm above the roof.
12 4 1 extension above roofs.
A drip edge vent is made of a corrosive resistant material that sticks out about three inches back from the roof edge and then bends downward over them.
The 1992 vent sizing tables below and more recent codes all require that all type b gas vents terminate above the roof with a listed cap or listed roof assembly in accordance with the manufacturer s instructions.
Organizations such as the nrca recommend against this roof vent style in cold climates because it can promote ice dams.
Plumbing code citations for plumbing vent or vent stack clearance distances.
Vent pipes shall terminate not less than 6 inches above the roof measured from the highest point where the vent intersects the roof.
Slits in the product allow for air to flow into the attic.