Get to know more about one of the most popular commercial roofing systems.
Roof rake edge detail.
Use larger rake boards such as 1 by 4 inch and 1 by 6 inch when there isn t an eave overhang on the gable end.
The rake edge should be installed at the rakes above the underlay of the roof.
When this occurs the water may run back under the edge of the shingles often wetting the roof deck.
Get assistance with detail drawings and products get started.
Purchase receive support from your local territory manager connect.
The rake of a roof is the outer edge that runs from the eave to the ridge or peak of the roof.
Always try to carry membrane felts over or up and over and down to ensure the roof membrane will always drain free and clear of any adjacent system.
Roof rake boards are installed in different widths based on the surface being covered.
This is done to seal the edges of the roof and to protect the roof s components from wind driven rain.
Repairing your roof repairing your roof.
In all cases it is important to properly detail and install the edge conditions.
Repairs after a storm.
Installing the rake edge in this position closes off the edges of the underlayment specifically.
One by 2 inch rake boards often cover the exposed top edge of the siding when there also is an eave overhang on the gable end.
Repairing your roof.
Learn about perimeter edge metal.