The top of the wall is covered by a copper coping cover similar to detail 9 3a.
Roof parapet coping detail.
On the roof side the cover is locked into a standing seam parapet cover.
These high performance products provide more than enough protection at vulnerable parapet walls so you can be confident in the long term performance of your roofing system.
A critical and often overlooked design detail is at the termination of a parapet coping at a wall.
Expansion joint roof to wall paraguard expansion joint roof to wall wall with self terminating parapro flashing.
Wall with self terminating paraflex 531 liquid flashing.
Parapet with plywood sheathing.
Continuously hand crimp hem over cleat coping 1 1 2 long galvanized steel hex head screw with washer at 18 o c.
Slope the top of them inward so they don t stain the building façade.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
Metal and stone copings leak at joints.
High parapet copper roof.
Lightning protection system roof mounted paratread.
The easiest thing to get right about parapet construction is to keep rainwater from getting into the top of them.
Hold your cursor over the file name to view when a drawing was last updated.
Curb with adhesive applied flashing.
Creativeminds cad drawing and structure detail of roof parapet wall along with coping and drip course detail.
Fri 12 13 2019 06 20.
The continuous formed anchor is 24 ga.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
The principles are easy.
Parapet with paraguard coping.
100 dan road canton ma 02021 phone 1 800 451 2504 sales 1 800 576 2358.
This cover in turn laps over base flashing which is cleated to the roof deck or a nailing strip.
Construction detail c 1 the nrca roofing manual 8 31 17 ansi spri es 1 tested resistance.
Omg formed coping and formed coping plus products are easy to install tested and warranted systems that act as the roof s first line of defense.
The omittance of the termination metal leaves an opening at the top of the coping and allows for moisture infiltration at the space between the parapet.
The most common mistake at this intersection is to allow the metal coping to but up to the wall without the application of termination metal.
A combination of elements are used in this detail.
Roof parapet wall dwg cad drawing detail.
Roofing nail at 6 o c.