The top of the roof pan is formed into a bread pan whose upper edge is just above the finished batten.
Roof edge flashing detail.
Two ways to flash roof edges.
The flashing of the head of a batten seam roof at a wall is shown in this detail.
A copper receiver holds the counterflashing at its top edge.
208 termination bar roof edge detail fully adhered mechanically attached image vnd dwg download.
68 profiles in over 40 colors quality edge s full line of drip edge or perimeter edge flashings provides the visual appeal homeowners are seeking and the performance sophisticated builders and contractors rely upon to protect roofs exposed edges and other areas exposed to the elements.
Paraguard expansion joint roof to roof with parasolo flashing.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
They must be carefully designed and installed to provide the appropriate performance and life expectancy.
Wall flashing with coated metal edge.
Pdf mb bur 21 scupper thru roof edge detail.
Paraguard expansion joint roof to wall with parasolo flashing.
Details roofing wrb flashing.
Roof drip edge flashing serves multiple functions on a building the foremost of which is to assist water in leaving the roof edge with minimum damage to other building components by directing the water off of the roof and into the gutter.
One common method is to lay the edge metal under the eaves membrane and over the rake.
Allow the epdm field membrane to pass over the edge by minimum 100 mm and fully adhere it to the front of the wood nailer over its full length.
Install a wood nailer at the roof edge.
Protect the eave from ice dams and sideways rain step one in steep slope roofing is the edge flashing.
Mb bur 20 raised perimeter edge with metal cap fascia flashing detail.
Copper flashing is locked into this edge and extends at least 8 up the wall.
High wall flashing detail 10 wide sheets.
Roof area divider curb type.
Wall base termination detail.
Use stainless steel screws to fasten the metal edge profile to the wood nailer at 100 mm on centre.
Roof edge flashing 1 900 drip edge possibilities.
Place the drip edge down aligning it so water will drip into the gutters.
Roof edge details 9 1 general of all exterior building components roofs probably have the greatest exposure to environmental and physical abuse.
Because of the wide variation in detailing this section will not.
Wall with self terminating parapro paraflex 531.
Install drip edges on the eaves first.